The article presents the project design to strengthen the foundation reinforcement to soils through the gaps arranged at the discharge cementogenesis solutions. Also describes development work at the construction site, which allowed to adjust the project and reduce the cost of consolidation.
Keywords: Reinforcement, soil, comentaron, cementation, directional hydraulic fracturing, drilling, well, development work