The paper analyzes and shows the inadequacy of the technology for repairing production wells by rolling out a corrugated metal patch with a dornating device, which consists in premature violation of the tightness of the well due to low strength of the connection. A technology and a hydromechanical device for additional fastening by radial extrusion of spherical cavities in the metal of the plaster are proposed. As a result, a drag force is generated in the cross-section of the fastener, which prevents shear loads from axial forces. Strength calculations have shown that for better performance of the metal patch, it is advisable to increase the shear resistance force by increasing the number of punches or technological transitions of fastening.
Keywords: casing, production string, well tightness, metal plaster, radial extrusion, strength