This article discusses the need for modernization of existing thermal power plants (TPPs) in Moscow. The profitable aspects of technical re-equipment are considered, as well as the factors affecting the composition and implementation of investment projects for the development of existing thermal power plants in the capital are studied.
Keywords: thermal power plant, modernization, technical re-equipment, hazardous production facility, technical condition assessment, major repairs, investment project, service life, construction and installation works, technological equipment
This article discusses various options for carrying out construction and installation works during the technical re-equipment of energy-processing equipment in the building of the Main Building of the existing CHPP. The methods of installation of large-sized equipment to the design mark are studied by three different methods with a description of the features of the work and the characteristics that affect the cost of the work. The enlarged schedule of construction and installation works on technical re-equipment of the boiler drum is given.
Keywords: thermal power plant, technical re-equipment, construction and installation works, technological equipment, large-sized equipment