In work design and technological process optimization of hammer crusher chipper production is performed. Replacement of material which the product is made of is executed, and machining volume with formation of a number of detail constructive elements is reduced during receiving preparation stages.
Keywords: hammer crusher chipper, optimization, design, technological process, material, preparation, prime cost, annual economic effect