×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

  • Problems of construction and technical expertise in determining the volume and cost of actually qualitatively performed works

    The construction industry at all times was one of the most popular, as it is closely connected with the life of people. The stronger the population of our planet grows, the more it becomes necessary to erect an ever larger number of be it industrial or residential buildings and structures. This article discusses the problems of technical expertise in determining the volume and cost of actually high-quality work performed. The main problem is that most of the works carried out during construction (repair) are hidden and it is not possible to verify them, therefore, the expert in this examination is forced to be guided by the acts of examination of hidden works and the journal of the work. One of the main causes of disputes between the customer and the contractor is the overestimated volume of work performed, as well as poorly executed work.

    Keywords: Problem, expertise, covert operation, hidden work, construction, repairs, cause, dishonesty, conclusion, expert, quality

  • Features of the construction and technical expertise of the reconstructed entertainment complex in Rostov-on-Don

    This work is devoted to the problem of carrying out construction and technical expertise of reconstructed public buildings. The main problems of modern reconstruction of urban development are considered. The differences between the reconstruction of public buildings and residential or industrial buildings have been revealed. The difficulties faced by the contractors during the reconstruction are estimated. The difficulties faced by the contractors during the reconstruction are estimated. The main points that experts turn to when examining a reconstructed object are noted. The disadvantages associated with the lack of a developed procedure for reconstruction and construction and technical expertise are considered. Conclusions based on the results of the study were made.

    Keywords: reconstruction, public buildings, the specifics of the work performed, poor scientific study, human safety